Department of Economics and Business Economics

Simon Emde

  1. 2010
  2. Published

    Balancing mixed-model assembly lines : A computational evaluation of objectives to smoothen workload. / Emde, Simon; Boysen, Nils; Scholl, Armin.

    In: International Journal of Production Research, Vol. 48, No. 11, 01.01.2010, p. 3173-3191.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  3. 2011
  4. Published

    Fast timing with plastic scintillators for in-beam heavy-ion spectroscopy. / Hoischen, R.; Pietri, S.; Rudolph, D.; Prokopowicz, W.; Schaffner, H.; Emde, S.; Golubev, P.; Wendt, A.; Kurz, N.; Wollersheim, H. J.; Gerl, J.

    In: Nuclear Instruments and Methods in Physics Research, Section A: Accelerators, Spectrometers, Detectors and Associated Equipment, Vol. 654, No. 1, 21.10.2011, p. 354-360.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  5. 2012
  6. Published

    Determining crane areas for balancing workload among interfering and noninterfering cranes. / Boysen, Nils; Emde, Simon; Fliedner, Malte.

    In: Naval Research Logistics, Vol. 59, No. 8, 01.01.2012, p. 656-662.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  7. Published

    Optimally locating in-house logistics areas to facilitate JIT-supply of mixed-model assembly lines. / Emde, Simon; Boysen, Nils.

    In: International Journal of Production Economics, Vol. 135, No. 1, 01.01.2012, p. 393-402.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  8. Published

    Optimally loading tow trains for just-in-time supply of mixed-model assembly lines. / Emde, Simon; Fliedner, Malte; Boysen, Nils.

    In: IIE Transactions (Institute of Industrial Engineers), Vol. 44, No. 2, 01.02.2012, p. 121-135.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  9. Published

    Optimally routing and scheduling tow trains for JIT-supply of mixed-model assembly lines. / Emde, Simon; Boysen, Nils.

    In: European Journal of Operational Research, Vol. 217, No. 2, 01.03.2012, p. 287-299.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  10. 2013
  11. Published

    Just-in-Time supermarkets for part supply in the automobile industry. / Battini, Daria; Boysen, Nils; Emde, Simon.

    In: Journal of Management Control, Vol. 24, No. 2, 01.01.2013, p. 209-217.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  12. Published

    Scheduling train loading with straddle carriers in container yards. / Boysen, N.; Emde, S.; Fliedner, M.

    In: Journal of the Operational Research Society, Vol. 64, No. 12, 01.12.2013, p. 1841-1850.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  13. 2014
  14. Published

    The berth allocation problem with mobile quay walls : Problem definition, solution procedures, and extensions. / Emde, Simon; Boysen, Nils; Briskorn, Dirk.

    In: Journal of Scheduling, Vol. 17, No. 3, 01.01.2014, p. 289-303.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

  15. Published

    One-dimensional vehicle scheduling with a front-end depot and non-crossing constraints. / Emde, Simon; Boysen, Nils.

    In: OR Spectrum, Vol. 36, No. 2, 01.03.2014, p. 381-400.

    Research output: Contribution to journal/Conference contribution in journal/Contribution to newspaperJournal articleResearchpeer-review

Previous 1 2 3 4 5 Next