A Model to Link Takt Schedules and Operations in Construction

Publikation: Bidrag til bog/antologi/rapport/proceedingKonferencebidrag i proceedingsForskningpeer review

This research paper presents a model for construction that can bridge the gap between the schedules (takt planning or location-based management) and the on-site operations using visual management (VM). The model was developed using design science. It was shaped in a modular construction environment and evaluated theoretically. The knowledge base consists of; takt planning, location-based scheduling (LBS), plan-do-check-act, and visual management. The evaluation of the model revealed that a generic model could accommodate both schedule methods and incorporate continuous learning. The discussion provided knowledge about the industrial implication and how managers could apply this in Takt or LBS planned and controlled projects. This research further contributes to the literature by extending the existing knowledge of scheduling and visual management.
OriginalsprogEngelsk
TitelLean Construction in Crisis Times : Responding to the Post-Pandemic AEC Industry Challenges
RedaktørerLuis F. Alarcón, Vicente A. González
Antal sider10
UdgivelsesstedLima
ForlagPontificia Universidad Católica del Perú
Udgivelsesår2021
Sider667-676
ISBN (trykt)978-612-48025-4-6
DOI
StatusUdgivet - 2021
Begivenhed29th Annual Conference of the International Group for Lean Construction - online, Lima, Peru
Varighed: 14 jul. 202117 jul. 2021

Konference

Konference29th Annual Conference of the International Group for Lean Construction
Lokationonline
LandPeru
ByLima
Periode14/07/202117/07/2021

Se relationer på Aarhus Universitet Citationsformater

ID: 217936273